CASE STUDY
Hi-Crush Inc.
- Blair, Wisconsin
- LOCATION
- Frac Sand
- INDUSTRY
Key Insights
Hi-Crush hauls over 900 tons per hour of material from their wet plant to their dry using engineered overland conveyors. Part of their operation also involves using a TeleStacker® Conveyor for stacking finished products.
With Superior’s color-coded parts and “plug and play” technology, the company was able to set-up their conveyor all by themselves.
Before the TeleStacker Conveyor, Hi-Crush was challenged with having little space to stockpile and easily moving to a new stockpile location. Now, the company can easily transition to a new area for stockpiling and finds that they move their conveyor at least three times a week.

More Projects & Resources

Preferred Sands Achieves $700,000 in Annual Savings by Transitioning to Conveyor Systems

From Overburden to Opportunity: Hoover Materials Turns Sand into Profit
_1-1%20Santa%20Fe%20Aggregates%20-%20Kaweah.jpg)